Project Overview |
The Clover Switchyard upgrade includes construction of the following:
- Earthworks for the extension of the 66kV switchyard platform and re-grading the existing 66kV switchyard and associated drainage works.
- Modification to existing road.
- Extension to the security fencing.
- New transformer slab, fire wall and bunded area for new 66/11kV transformer.
- Oil containment system for new transformer bunded area.
- Rebuild of 66kV switchyard including circuit breaker, disconnector, VT, Post insulator, Gantry and 66kV Pole structures and footings.
|