JJR Involvement |
JJR conducted an annual technical inspection of the Wagga Wagga Aerodrome facilities with a focus on ensuring:
- Staff were adequately trained in safety related procedures;
- Airport management was aware of safety related functions;
- The physical characteristics of the airport complied with relevant standards and were of adequate safety;
- Operating procedures were consistent with the Wagga Wagga Aerodrome manual and appropriate for the level of aircraft activity; and
- The airport complied with the requirements for a certified aerodrome according to the Commonwealth’s Civil Aviation Safety Regulations.
In order to ensure the airport complied with the above the following was conducted:
- Inspection for non-compliance with MOS Part 139;
- Instrument survey of the approach, take-off and transitional surfaces of the airport runway;
- Inspection of movement area pavements and drainage;
- Inspection of facilities at the aerodrome used for either wildlife hazard management or aerodrome emergencies;
- Review of the safety or risk management plan;
- Inspection of airside vehicle control arrangements; and
- A check for the currency and accuracy of aerodrome information in the Aeronautical Information Package and aerodrome operating procedures in the Wagga Wagga Aerodrome manual.
|