Project |
BLB1 Gangway Tower Project Structural Review |
Client |
NSW Ports |
Project Value |
< $100k |
Project Overview |
New South Wales Ports intends to demolish the existing Fire Monitor Tower at Port Botany and install a new Gangway Tower. The client required a structural assessment of the wharf due to changing the tower. |
JJR Involvement |
The project involved the following:
- Engineering analysis and reporting on the structural capacity of the existing berth due to installation of the new gangway tower.
- Assessment of the wharf including all functional and environmental loadings including wave loading.
- Review and report on the adequacy of the gangways foundation plate at the interface between the gangway and the berth structure.
- Any other aspects that should be reviewed or analysed for the installation works.
|