Project Overview |
Mackay Regional Council engaged JJR to undertake a risk-based Aviation Safety Case for issues associated with the Mackay Airport Obstacle Limitation Surface (OLS) and the proposed upgrade of the Milton East / Boundary Road East intersection. |
JJR Involvement |
The scope of work for this project involved:
- Assessment of current aircraft operations at Mackay Airport;
- Assessment of the capacity of Runway 14/32 and the wind usability of Runway 05/23;
- Current third party intersection lighting designs reviewed against the current Runway 05/23 Code 3 OLS;
- Runway 05/23 Code 2 and Code 1 OLS developed;
- Other critical aeronautical surfaces assessed to determine the risk to aircraft operations;
- Third part intersection lighting designs reviewed against the alternative OLS and other critical surfaces;
- OLS drawings showing impacts of the road lighting prepared; and
- A safety case for submission to the aerodrome operator and Civil Aviation Safety Authority (CASA) was developed.
|