Project |
Concrete Wash Down Bay Options Analysis |
Client |
Archerfield Airport Corporation |
Project Value |
< $100k |
Project Overview |
Archerfield Airport required a hydraulic analysis of the concrete wash down bay to determine the feasibility of increasing the depth of the interceptor for additional water use. |
JJR Involvement |
The project involved:
- Site inspection of the wash down bay and interceptor trap;
- Analysis of the current capacity and operational efficiency; and
- Options analysis to determine the best option for increasing the capacity of the wash down bay.
|