Project |
Grassed Runways, Long Term Options Analysis |
Client |
Archerfield Airport Corporation |
Project Value |
< $100k |
Project Overview |
Archerfield Airport required engineering services for the realignment and resurfacing of their grassed runway in line with the proposals of their 2011 Master Plan. |
JJR Involvement |
The development of the grassed runway project included the following activities:
- Undertake overview of issues affecting the operation of the grassed Runway after wet weather events;
- Provide summary of the potential options to improve the serviceability of the grassed runway;
- A cost estimate for each potential option to optimise whole of life costs;
- A recommended option to implement at critical areas.
- Assessment of topographical survey, aerial survey and existing grades;
- Grading design as per MOS139 compliance;
- Bulk earthworks design and analysis of cut/fill and pavement quantities; and
- Preparation of design documentation and reports.
|