Project |
Rehabilitation Works for Taxiway Juliet at Archerfield Airport |
Client |
Archerfield Airport Corporation |
Project Value |
< $100k |
Project Overview |
The client required a review of previous pavement and drainage repairs for Taxiway Juliet, and identification of future maintenance requirements. |
JJR Involvement |
The completed works resulted in the preservation of the pavement to keep out water / moisture resulting in less pavement failures and reduction in maintenance costs which resulted in:
- Reduction in FOD issues (less risk of damage to aircraft)
- Reduction in complaints from aircraft users and also benefits to AAC reputation with operators by fixing issue with box drain
- Decrease risk of CASA audit observations or non-conformance notifications
|