Project | Aerodrome Technical Inspections for Camden Airport, Camden |
Client | Aeria Management Group |
Project Value | < $1M |
Project Overview | Aeria Management Group engaged JJR to conduct the Aerodrome Technical Inspection (ATI), Obstacle Limitation Surface (OLS) Survey and Electrical Technical Inspection of Camden Airport in Sydney. |
JJR Involvement | JJR’s expert team undertook an ATI, ETI and OLS Survey in accordance with the Civil Aviation Safety Authority (CASA) Manual of Standards (MoS) Part 139 – 2019 and Advisory Circular (AC) 139.C04 v1.1 – Aerodrome technical inspections and manual validations.
The team provided the client with an ETI Report, OLS Survey Report, and the ATI report which included a review of standards, key findings of the inspections, and recommended corrective actions. |