JJR Involvement |
JJR’s experienced engineers conducted inspections of the two bridges and associated road and piers. A report was prepared for the Level 3 inspections, which included key findings, sketches, photographic evidence, and the capacity for axial compression determined by reviewing data in a Level 2 inspection report, provided by the client. A report for the Level 2 bridge along Enterprise Road was completed, which included key findings from the inspection, photographic evidence and determined the lateral deformation of elastomeric bearings for the piers. |