Project | Hybrid Concrete Protection System Inspection for the Chelsea Yacht Club |
Client | Kingston City Council |
Project Value | < $100K |
Project Overview | The Chelsea Yacht Club required a structural inspection and condition assessment to verify the effectiveness of the existing Hybrid Cathodic Concrete Protection System structure. |
JJR Involvement | In order to verify that the building foundational slabs and concrete structures were protected, JJR visually inspected and assessed the concrete structure, visible Ground elements, and Hybrid Cathodic Structure, verified the existing steel corrosion, and also reviewed all relevant quality, installation, and operational documentation.
JJR also ensured that the cathodic protection system’s electro-potential was functioning as required to ensure the ongoing durability of the critical structural elements. |