Project | Swan Street Bridge Upgrade, Project Engineering for Bridge Installation |
Client | Seymour Whyte Constructions |
Project Value | $50M – $100M |
Project Overview | Seymour Whyte requested Project Engineering Services to assist with the installation of the new Swan Street Bridge.
The bridge structure had also footpaths on either side and a bicycle lane across it. JJR team lead all relevant stakeholders from both a technical and commercial perspective to ensure a successful project outcome. This included developing options to optimise the efficiency of component installation and minimise the costs (particularly due to crane hire) and prepare detailed work method statements for the installation of the new steel bridge wings on the Swan Street Bridge. |
JJR Involvement | JJR’s scope of work will include being seconded into the SWC team to lead the successful installation of the new steel wings to the Bridge.
Undertaking a detailed review of the bridge design documentation
|