Client | NSW Ports |
Project Value | <$1M |
Project Overview | The Pilot Jetty and Emergency Response Jetty are located at the eastern end of the re-entrant basin, adjacent to the tug jetty. This jetty includes 3 no. berthing dolphins and steel / timber superstructure to allow passenger and service traffic to the tugs. The Emergency Response Jetty was built in 1989. |
JJR Involvement | JJR undertook a structural condition assessment and identified various elements of the pilot jetty that needed to be refurbished.
Structural design was conducted using information obtained during the site inspection, the drawings provided by NWS Ports, utilising relevant Australian Standards including;
The following elements have been designed and drawings provided for this scope of the refurbishment of the emergency response jetty:
|