Project |
Structural Condition Assessment of Hangar 110 at Archerfield Airport |
Client |
Archerfield Airport Corporation |
Project Value |
< $100k |
Project Overview |
The World War II era Bellman Hangar at Archerfield Airport was damaged during a severe storm. The cause of this damage was identified as internal pressures causing the structure to lift and fall back down. The client required a structural assessment of the hangar to determine its integrity. |
JJR Involvement |
The project involved the following:
- Visual structural inspection of the hangar;
- Review and analysis of the structural integrity of the hangar;
- Develop proposed remediation works to repair the hangar;
- Contract administration; and
- Project management of the confirmed works.
|